Now he may look professional on those stilts but that is our son Tim who came home for a week to help me put the gyprock in the basement cinema room. We were certainly glad that we had chosen to load all the necessary sheets down in basement before we poured the top slab.
16 July 2007
05 July 2007
19 Months Later and We Are At "Lock Up"
The outside of house is nearly finished. Just need to wait for render to dry prior to painting. Also need to tile the verandah prior to getting the bullnose vernadah erected. The back still has heaps to do. Have to put all the deck down as well as pavers and lawn. I had to build the pergola so that the plumber could install the box gutter. Can't wait to relax out back rather than house building every waking moment