14 April 2007

The Bricky Is Back


Its April '07 and we got the roof on. I have also installed all the cedar window frames. (That was after I had put 2 coats of sealer on all of them). The window slides are currently being double glazed. There is also a number of windows that I am making leadlight for. The bricky is currently laying the limestone quoins and side walls. The front of the house will be sandstone.