Pictures of the cinema room. All walls painted in Dulux Suede Effects. The colours are more like those in the top photo and even then the ceiling is darker than it looks but currently have large floodlight on which makes it hard to get a photo with true colours. The white wall is where the screen will be. There will also be low level - glass door cabinet right across the bottom to house all the components. The upright pillars will house the speakers and there is a recess behind the front corner ones to accomodate electric curtains.
20 September 2007
15 August 2007
Leadlight
A collection of photos of the leadlight that has been installed so far. Top photo is the bay window in the front lounge. The next photo is the main bedroom. The small window is in the front door so that is all the windows at front of house with the similar design. The final leadlight is a full length window in the bathroom. I still have to make a fairly large skylight that will sit over the island bench in the kitchen.
05 August 2007
Finishing the Gyprock
03 August 2007
Basement Cinema Room
Well the cinema room is progressing well. Our son Tim demanded that we put in all the fake pillars and beams. In the cinema area the beams are finished with a cornice that when painted will help to "seperate " that section of room from the pool table and bar are which is on the raised floor level. The columns will house centre speakers and rear speakers as well as sconce lighting. All lighting will be controled throughout the whole house by Clipsal C-Bus so we have included pelmet for the electric curtain. A touch screen juke box in bar area will be able to be viewed on a TV screen over the bar or it can be wiewed on the projector screen. Whilst all the prewiring has been done I still have to make the front speaker housings as well as the component cupboard. But I think it will all be worth the effort!!
16 July 2007
Its Time To Gyprock
05 July 2007
19 Months Later and We Are At "Lock Up"
The outside of house is nearly finished. Just need to wait for render to dry prior to painting. Also need to tile the verandah prior to getting the bullnose vernadah erected. The back still has heaps to do. Have to put all the deck down as well as pavers and lawn. I had to build the pergola so that the plumber could install the box gutter. Can't wait to relax out back rather than house building every waking moment
14 April 2007
The Bricky Is Back
Its April '07 and we got the roof on. I have also installed all the cedar window frames. (That was after I had put 2 coats of sealer on all of them). The window slides are currently being double glazed. There is also a number of windows that I am making leadlight for. The bricky is currently laying the limestone quoins and side walls. The front of the house will be sandstone.